29 August Saturday

Please 'sign' everything in the top portion of the page so we know who posted it.

Pictures for Today

Start here. Please locate this page under 'Fiddle Yard' - or move it there if you've mistakenly put it at the top level.

Bringing out the heavy duty track levelling equipment!

Breaking off the edge of the punga log retaining wall concrete footing which, if I remember correctly, was why I originally laid the track here some 25mm higher than it should have been.

Now relayed at a constant 1:45.5 grade over 8m, or 11mm rise every 500mm.  Very easy done with a fibre tape laid along the track centre line and levelled at each 500mm increment using the laser and staff (well a ruler taped to a level) to measure the required rise.  Apart from some shagging around getting the track right through a tunnel it is quicker than you may think.  Final levels probably +/- a millimetre or two but it's so much more easier to get it right with the right gear.  (JRinTawa)



Don't forget the "Search" above!
It allows you to search this site and works well.

Admin Notices 

None yet today.
Comments